New: GCC Blueprint. How GCCs are built well, from mandate to first-year value, drawn from experience. Explore

Series

Setting up a GCC

The quality of a GCC is largely decided before it opens. These articles cover the early decisions: whether to build at all, the charter, the business case boards actually approve, GCC versus outsourcing versus BOT, location and the operating model.

11 articles

Start with

  1. The most important GCC decision isn’t where you build. It’s what you decide to build

    Location and operating model matter, but the defining decision is the role the GCC should play in the enterprise’s future.

    2 min read

  2. Why most GCC setups look good on paper but fail in reality

    A GCC setup can look structured and predictable on paper. On the ground, many struggle not because the strategy is wrong, but because of how it is executed.

    2 min read

  3. GCC operating models that work, and the ones that quietly collapse

    The gap between GCCs that thrive and those that fade has never been wider. In the critical early years, operating model design decides which way a centre goes.

    2 min read

  4. GCC, outsourcing or BOT: choosing the right model without bias

    Choosing between a GCC, outsourcing and build-operate-transfer is not a maturity question. It is a question of control, capability and risk.

    1 min read

  5. If you can’t articulate your GCC’s charter in one slide, don’t start one

    Most GCCs struggle not because of talent or scale, but because no one can say clearly why they exist. A strong charter fits on one slide.

    1 min read

All articles in this series

  1. GCC setup isn’t one project

    GCC programmes are usually split into strategy, assessment, design and implementation, often run by different teams. The problem is not the phasing but the lack of accountability across it.

    2 min read

  2. The best GCC location is no longer a country

    India leads the GCC market, but there is no longer a single best country. Locations are specialising, and the right choice depends on the capability being built.

    2 min read

  3. Setting up a finance GBS? It’s not about moving work, it’s about fixing it first

    Moving broken finance processes into a GBS simply relocates inefficiency at scale. Simplify, standardise and automate first, then move the work.

    2 min read

  4. Why mid-size multinationals are now setting up GCCs

    GCCs are no longer only for the Fortune 500. Mid-size multinationals are setting up centres to access talent they cannot find in saturated home markets.

    2 min read

  5. When not to set up a GCC: sometimes outsourcing is the smarter choice

    Not every capability needs to be owned. When work is transactional, volatile or non-core, outsourcing is often the smarter choice.

    1 min read

  6. The real business case for a GCC

    Consultants sell GCCs on scale and transformation. Boards approve them for control, risk reduction and predictability, and the gap between those narratives is where expectations drift.

    1 min read

Other series

All series →