Phase 3 of 10 · Design

The delivery model

How will we own the centre?

The big picture

How you own the centre matters more than where you build it. Models are often chosen because an adviser or a peer prefers them. The right model is a direct expression of what you are trying to achieve, what you can genuinely execute, and how much time you have.

The decisions that matter

  • Captive, managed or Build-Operate-Transfer (BOT), or hybrid
  • If BOT: the transfer triggers, IP terms and workforce continuity
  • If captive: who leads the foreign subsidiary, and when a managed layer would be added
  • The conditions that would trigger a change of model later

What good looks like at the end

  • A model decision with the five factors scored and the trade-offs written down
  • For BOT, contract terms covering transfer triggers, IP ownership and workforce continuity
  • A plan to build retained capability from month one

Who owns it

The sponsor, with Legal, HR and Procurement

When

Once the mandate and business case are approved; it shapes every set-up step that follows.

Delivery models compared

DimensionCaptiveManaged or BOTHybrid
ControlFullShared, by contractPartial, by agreement
Speed to first value18 to 30 months6 to 12 months12 to 20 months
Capital outlayHighLowMedium
Talent ownershipDirect employerThird-party employerMixed
IP and data riskLowestHigherManaged by contract
Best suited toScale, long-term commitment, strong HR capabilityTesting the model, or speed-to-value pressureScaling from a pilot, or complexity across geographies

Typical ranges from The GCC Advantage. A captive usually needs 12 to 18 months before the first process transfers; a strong BOT provider can have the first processes live in four to six months.

What specialist advisers say

Curated from published work by ANSR and Everest Group. Summarised in our own words; follow the link for the full piece.

  • ANSR

    A typical Build-Operate-Transfer runs in three phases: build in about 6 to 9 months, operate for 2 to 4 years, and transfer in 3 to 6 months. The transfer is the legal migration of assets, employee contracts and IP into your own entity.

    How UK Enterprises Use Build-Operate-Transfer to Set Up in India, 7 August 2026

  • Everest Group

    In BOT models, knowledge, tooling and leadership often do not transfer as cleanly as expected, so plan the transition in structure. Choose partners on transparency, cultural fit and adaptability, not capabilities alone.

    Getting the Setup Right: The Early Aha Moments That Can Define GCC Success, 14 July 2025

  • ANSR

    Set three to five success measures first (such as cost per transaction, cycle time, error rates, employee NPS and business impact), then match the model to your priorities, weighing speed against control and IP sensitivity.

    How to Pick a GCC Operating Model in 30 Days, 18 June 2026

In detail

The approach

  1. Score the five deciding factors

    Strategic horizon (10+ years favours captive), internal programme capability, speed to first value, data and IP sensitivity, and capital availability. Two or three will usually point the same way.

  2. Resolve conflicts explicitly

    Where factors conflict, for example high IP sensitivity but tight capital, a managed model with strong data governance and a defined transfer within about 24 months often resolves it. Write the trade-off down.

  3. If BOT, design the transfer on day one

    Contract the transfer triggers, IP ownership and workforce continuity. Start building the retained leadership that will absorb the transfer from month one, not month 30.

  4. If captive, be honest about capability

    Someone must run a foreign subsidiary: entity, payroll, HR, legal, facilities and local vendors. If that person is not identified, the plan is not ready.

  5. If hybrid, govern the boundary

    Define hand-off protocols, a shared SLA framework and joint operating reviews so the boundary does not become a gap.

  6. Pre-plan the next model

    Define the conditions under which you would change model, and talk to two or three reputable providers before you need them.

Readiness signals

The signs that need attention before a centre moves on from this phase.

  • All five factors are scored and the chosen model follows from them
  • Any trade-off between factors is written down and agreed
  • For BOT: transfer triggers and the retained leadership plan are in the contract
  • For captive: the person who will lead the subsidiary is identified
  • The conditions for a future change of model are defined

Where organisations go wrong

  • Choosing the model your adviser or a peer prefers

    What works: Let the five factors decide.

  • Treating BOT as a way to avoid building capability

    What works: BOT defers the capability requirement; it does not remove it.

  • A first-time hybrid without governance maturity

    What works: Start simpler, and evolve to hybrid once the operating model is mature.

Questions for leadership teams

  • Which model do the five factors point to, and what trade-off are we making if they conflict?
  • For BOT: who in our organisation will lead the centre from the moment of transfer, and are they already in the building?
  • Under what conditions would we change model, and how would we do it without disrupting delivery?